Mobile Phase Priming - Agilent Technologies InfinityLab 1290 Infinity II User Manual

Evaporative light scattering detectors
Table of Contents

Advertisement

5
Optimizing Performance

Mobile Phase Priming

Mobile Phase Priming
The ELS detector does not require any mobile phase priming. It is recommended
that priming of the LC system is performed without the ELS detector attached to
prevent nonvolatile impurities contaminating the ELS detector.
The mobile phase should be degassed and filtered, either by sparging with
Helium or using an online degasser.
Agilent InfinityLab ELSD User Manual
63

Advertisement

Table of Contents
loading

Table of Contents