Keyboard Unit; Operation Panel I/O Unit - Mitsubishi Electric M70V Series Connection Manual

Table of Contents

Advertisement

MITSUBISHI CNC
3 Installation

3.3.2 Keyboard Unit

Mount the keyboard unit with four fixing screws.
(Note 1) Refer to "General Specifications: Keyboard Unit" for the panel cut dimension drawing and the screw hole
position.
(Note 2) A clear protective film covers the sheet keys of the keyboard at the time of shipment. Make sure to remove the
sheet before use.

3.3.3 Operation Panel I/O Unit

Mount the operation panel I/O unit on the back of the keyboard unit with four fixing screws.
(Note)
The operation panel I/O unit is usually mounted on the keyboard unit when shipped.
92
Fixing screws (4)
Fixing screw (4 pcs.) M3x25
(with plain washer and spring washer)
NCKB
Connector

Advertisement

Table of Contents
loading

Table of Contents