Mitsubishi Electric M70V Series Connection Manual page 63

Table of Contents

Advertisement

MITSUBISHI CNC
2 General Specifications
[FCU7-DX720/ FCU7-DX721/ FCU7-DX730/ FCU7-DX731]
(1)
(2)
(3)
(4) (5)
(6)
(Note)
(9) is not available for FCU7-DX731.
<Dimension drawing for installing on the panel>
(Note)
Use M3x25 screws (with spring washer and plain washer) when mounting the operation panel I/O unit.
38
116
(9)
(10)
(11)
(12)
(7)
(8)
116 (
Unit outline
)
106 ± 0.3
4- M3 Screw
110 (
Space required for wiring)
(13)
<Installation on the back side of the keyboard>
Operation panel I/O unit can be installed on the back side
of the keyboard.
Fixing screw (4 pcs.) M3x25
(with plain washer and spring washer)
NCKB
Connector

Advertisement

Table of Contents
loading

Table of Contents