Husqvarna FC 250 2016 Repair Manual page 264

Hide thumbs Also See for FC 250 2016:
Table of Contents

Advertisement

25 TECHNICAL DATA
Screw, shift lever
Screw, starter motor
Screw, timing chain guide rail
Screw, timing chain securing
guide
Screw, valve cover
Screw, water pump cover
Stud, cylinder head
Screw, autodecompression
Screw, camshaft bearing bridge
Screw plug, crankshaft location
Screw, timing chain tensioning rail
Screw, engine sprocket
Plug, oil channel
Rotor screw
Screw plug, cam lever axis
Screw, unlocking of timing chain
tensioner
Spark plug
Engine coolant temperature sen-
sor
Nut, cylinder head
Stud, cylinder head
Oil drain plug with magnet
Plug, oil pressure regulator valve
Oil drain plug
Nut, inner clutch hub
Nut, primary gear
262
M6
M6
M6
M6
M6
M6
M6
M7x1
M7x1
M8
M8
M10
M10x1
M10x1
M10x1
M10x1
M10x1
M10x1 .25
M10x1.25
M10x1.25
M12x1.5
M12x1.5
M14x1.5
M18x1.5
M18LHx1.5
14 Nm (10.3 lbf ft)
Loctite
10 Nm (7.4 lbf ft)
10 Nm (7.4 lbf ft)
Loctite
10 Nm (7.4 lbf ft)
Loctite
8 Nm (5.9 lbf ft)
10 Nm (7.4 lbf ft)
10 Nm (7.4 lbf ft)
15 Nm (11.1 lbf ft)
Loctite
14 Nm (10.3 lbf ft)
Lubricated with engine oil
10 Nm (7.4 lbf ft)
15 Nm (11 .1 lbf ft)
Loctite
60 Nm (44.3 lbf ft)
®
Loctite
15 Nm (11 .1 lbf ft)
Loctite
70 Nm (51.6 lbf ft)
Thread, oiled with engine oil/cone
degreased
10 Nm (7.4 lbf ft)
8 Nm (5.9 lbf ft)
10 ... 12 Nm (7.4 ... 8.9 lbf ft)
12 Nm (8.9 lbf ft)
Tightening sequence:
Tighten diagonally.
1st tightening stage
10 Nm (7.4 lbf ft)
2nd tightening stage
30 Nm (22.1 lbf ft)
3rd tightening stage
50 Nm (36.9 lbf ft)
Thread, oiled with engine oil/cone
greased
20 Nm (14.8 lbf ft)
Loctite
20 Nm (14.8 lbf ft)
20 Nm (14.8 lbf ft)
15 Nm (11.1 lbf ft)
100 Nm (73.8 lbf ft)
Loctite
100 Nm (73.8 lbf ft)
Loctite
®
243
®
243
®
243
®
243
®
243
2701
TM
®
243
®
243
®
243
®
243

Advertisement

Table of Contents
loading

This manual is also suitable for:

F2101

Table of Contents