Agilent Technologies InfinityLab LC Series User Manual page 65

Hide thumbs Also See for InfinityLab LC Series:
Table of Contents

Advertisement

3
Using the Module
Install the Thermal Equilibration Device
1 Check that the column in use is no longer than 30 cm.
2 Place the InfinityLab Thermal Equilibration Device covering one or more
3 Guide capillaries (and column ID tag cords, if installed) through silicone side
4 To avoid obstruction of the capillary guidance, remove the side covers of the
This measure is only necessary if several columns are connected to the column
NOT E
selection valve and two InfinityLab Thermal Equilibration Devices are installed in
one MCT.
5 Turn twist-lock clips with the hex-driver to fix the InfinityLab Thermal
6 Guide the capillaries through the recesses provided at the top and bottom of
This measure prevents the capillaries from being squeezed through the doors.
NOT E
7 Close the MCT door.
8 Let the system equilibrate before beginning the analysis.
Agilent InfinityLab LC Series Multicolumn Thermostats User Manual
installed columns in the way that the twist-lock clips are located at the top of
the device.
covers.
InfinityLab Thermal Equilibration Devices that point towards the valve.
Equilibration Device in place.
the module.
65

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

G7116bG7116a

Table of Contents