Fujitsu ETERNUS DX S5 Series Operation Manual (Basic page 20

Hybrid storage systems
Hide thumbs Also See for ETERNUS DX S5 Series:
Table of Contents

Advertisement

1. Basic Operation
Powering On and Off
2
Check that the READY LED of the controller enclosure or the frontend enclosure is lit up. For details about
the time required until the READY LED is turned on, refer to the table described in "IMPORTANT" of
"Powering On" (page
Drive enclosure
Controller enclosure
Drive enclosure
Controller enclosure
Frontend enclosure
18).
ETERNUS DX60 S5/DX100 S5/DX200 S5
ETERNUS DX900 S5
ETERNUS DX500 S5/DX600 S5
20
Operation Guide (Basic)

Advertisement

Table of Contents
loading

Table of Contents