Removing the air baffle from a 9009-41A, 9009-41G, 9009-42A, 9009-42G, 9223-42H, or 9223-42S
system
Use this procedure to remove the air baffle from a IBM Power System S914 (9009-41A and 9009-41G),
IBM Power System S924 (9009-42A and 9009-42G), IBM Power System H924 (9223-42H), or IBM
Power System H924S (9223-42S) server.
Procedure
1. Ensure that you have the electrostatic discharge (ESD) wrist strap on and that the ESD clip is plugged
into a ground jack or connected to an unpainted metal surface. If not, do so now.
2. For a rack-mounted system, lift the air baffle (A) straight up as shown in Figure 30 on page 45.
For a stand-alone system, remove the air baffle (A) straight out as shown in Figure 31 on page 46.
Place the air baffle upside down on a clean area.
Figure 30. Removing the air baffle from a rack-mounted system
Common procedures for installable features 45