Download Print this page

IBM 5105-22E Manual page 62

Common procedures for installable features
Hide thumbs Also See for 5105-22E:

Advertisement

Placing a rack-mounted 9009-41A, 9009-41G, 9009-42A, 9009-42G, 9223-42H, or 9223-42S system
into the operating position
Use this procedure to place an IBM Power System S914 (9009-41A and 9009-41G), IBM Power System
S924 (9009-42A and 9009-42G), IBM Power System H924 (9223-42H), or IBM Power System H924S
(9223-42S) server into the operating position.
Before you begin
Attention: When you place the system in the operating position, ensure that the cables at the rear
of the system do not catch or bind as you push the system unit back into the rack.
Procedure
1. Ensure that you have the electrostatic discharge (ESD) wrist strap on and that the ESD clip is plugged
into a ground jack or connected to an unpainted metal surface. If not, do so now.
2. For a rack-mounted system, unlock the blue rail safety latches (A) as shown in Figure 43 on page 60
by pushing them inward.
Ensure that the cable management arms can move freely. Ensure that the cables at the rear of the unit
do not catch or bind as you push the unit into the operating position.
Figure 43. Placing the system into the operating position
3. For a rack-mounted system, push the system unit (B) as shown in the previous figure back into the
rack until both release latches lock the system into position.
60 Power Systems: Common procedures for installable features

Advertisement

loading