Download Print this page

IBM 5105-22E Manual page 57

Common procedures for installable features
Hide thumbs Also See for 5105-22E:

Advertisement

Placing a 5105-22E, 9008-22L, 9009-22A, 9009-22G, 9223-22H, or 9223-22S system into the
operating position
Use this procedure to place the rack-mounted 5105-22E, IBM Power System L922 (9008-22L), IBM
Power System S922 (9009-22A and 9009-22G), IBM Power System H922 (9223-22H), or IBM Power
System H922S (9223-22S) server into the operating position.
Before you begin
Attention: When you place the system in the operating position, ensure that the cables at the rear
of the system do not catch or bind as you push the system unit back into the rack.
Procedure
1. Ensure that you have the electrostatic discharge (ESD) wrist strap on and that the ESD clip is plugged
into a ground jack or connected to an unpainted metal surface. If not, do so now.
2. Unlock the blue rail safety latches (A) by pushing them inward.
Ensure that the cable management arms can move freely. Ensure that the cables at the rear of the unit
do not catch or bind as you push the unit into the operating position.
Figure 39. Placing the system into the operating position
3. Push the system unit (B) back into the rack until both release latches of the system unit lock into
position.
Common procedures for installable features 55

Advertisement

loading