Download Print this page

IBM 5105-22E Manual page 29

Common procedures for installable features
Hide thumbs Also See for 5105-22E:

Advertisement

Figure 12. Removing the side cover
Installing the front and side cover
Use this procedure to install the front and side cover on a 5105-22E, IBM Power System L922
(9008-22L), IBM Power System S922 (9009-22A and 9009-22G), IBM Power System H922 (9223-22H),
IBM Power System H922S (9223-22S), IBM Power System S914 (9009-41A and 9009-41G), IBM Power
System S924 (9009-42A and 9009-42G), IBM Power System H924 (9223-42H), or IBM Power System
H924S (9223-42S) server.
Installing the front cover on a rack-mounted 5105-22E, 9008-22L, 9009-22A, 9009-22G, 9223-22H, or
9223-22S system
Use this procedure to install the front cover on a rack-mounted 5105-22E, IBM Power System L922
(9008-22L), IBM Power System S922 (9009-22A and 9009-22G), IBM Power System H922 (9223-22H),
or IBM Power System H922S (9223-22S) server.
Procedure
1. Ensure that you have the electrostatic discharge (ESD) wrist strap on and that the ESD clip is plugged
into a ground jack or connected to an unpainted metal surface. If not, do so now.
2. Gently push the cover (A) in until the cover snaps into place.
Common procedures for installable features 27

Advertisement

loading