Steps For Finalizing The Installation - FireplaceXtrordinair 4415 HO GSR2 Installation Manual

Hide thumbs Also See for 4415 HO GSR2:
Table of Contents

Advertisement

Steps for Finalizing the Installation

1. Remove the glass frame (see page 45).
NOTE: If using propane (LP) convert the appliance prior to installing the logs.
2. We recommend you purge the gas line at this time (with the glass frame removed). This allows gas to
be detected once it enters the firebox, ensuring gas does not build up.
3. Install the required firebacks (see page 49).
4. Remove the heat shield from the battery box (remove and discard the lock-tie – see illustration below).
Install the four AA batteries into the battery box (NOTE: the heat shield must be in place whenever the
fireplace is in operation). The AA batteries act as a power backup in case the household (AC) power
goes out and are required for operation.
below). Synchronize the transmitter to the IFC (see the owner's manual).
5. Make sure the accent light bulbs are in place and work correctly.
NOTE: Take care to not touch the bulb with your fingers (use a cloth or paper towel).
6. Install the crushed glass (see page 51).
7. Replace the glass frame.
© Travis Industries
Installation
(for qualified installers only)
Install three AAA batteries into the remote (see illustration
4/23/2021 - 1353
43
4415HO GSR2

Advertisement

Table of Contents
loading

Table of Contents