Service Processor (Fsp) Cable; Preparing The System To Remove And Replace A Service Processor (Fsp) Cable - IBM 9080-M9S Manual

Hide thumbs Also See for 9080-M9S:
Table of Contents

Advertisement

4) In the navigation area, click Actions > Activate.
5) Click Finish.

Service processor (FSP) cable

Preparing the 9080-M9S system to remove and replace a service processor (FSP) cable
To prepare the system to remove and replace a service processor (FSP) cable, complete the steps in this
procedure.
Procedure
1. From the Operation list, select Set Identify LED. Then, click OK to confirm the operation.
This action causes the identify LED for the faulty part to turn on, and causes the blue system ID LED to
turn on.
2. Use the blue LED to identify the server.
Ensure that the serial number of the system matches the serial number to be serviced.
3. From the Operation list, select FRU Level Deactivate. Then, click OK to confirm the operation.
4. Check that an amber identify LED (A) is flashing for one of the service processor cables as shown in the
following figures.
Note the LEDs that are flashing, indicating the cables to remove.
12 Power Systems: Removing and replacing parts in the 9080-M9S system

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents