Figure 36. Replacing the UPIC cable into the system control unit
d. Lightly pull on the UPIC cable from both attachment points to ensure it is locked into place. Pull the
cable connector; do not pull on the wire. The cables should be firmly attached to the system.
3. If you powered off the system to complete this repair, wait for the service processor comes up to the
Flexible Service Processor (FSP) standby state (the power-on LED on the control panel is flashing
slowly) then continue to the next step to validate all of the cables. If you did not power off the system,
skip the next step and continue to the step to validate only the UPIC cables.
4. Access the ASMI and run the Cable Plugging Validation utility to validate all of the cables.
a) If you are already connected to the ASMI, go to the next step. Otherwise, click All Systems then
select system being serviced. Then, click Actions > View All Actions > Launch Advanced
Systems Management (ASM).
b) In the navigation area, expand System Service Aids > Cable Plugging Validation. Then, click
Validate Cables. The system verifies that the expected cables are present.
c) If your configuration includes two or more nodes, expand System Service Aids > Cable Plugging
Validation. Then, click Verify Node Position. Otherwise, if your configuration includes only one
node, continue to the next step.
If the system is cabled correctly, the blue identify LED on each system node will light up, in
sequence, from the top node to the bottom node. If the LEDs do not light up in sequence, the FSP
cables need to be re-installed.
d) Expand System Service Aids > Cable Plugging Validation. Then, select All of the above in the
Display Cable Status section and click Continue. The system validates that the cables are installed
in the correct locations. Expand System Service Aids > Cable Plugging Validation to display a
table with the results. Ensure that the plugging status is OK for each cable in the displayed table. If
the status is OK, no further action is required. If the status is not OK, review the error logs, correct
the problems, and repeat steps b, c, and d as needed until the status is OK for all cables.
e) Exit the ASMI and skip the following step.
5. Access the ASMI and run the Cable Plugging Validation utility to validate only the UPIC cables.
Note: If you powered off the system to complete this repair, you validated the UPIC cables in the
previous step. You can skip this step.
Cables 43