Preparing The 9080-M9S System For Operation After Permanently Removing A Memory Module - IBM 9080-M9S Manual

Hide thumbs Also See for 9080-M9S:
Table of Contents

Advertisement

Figure 184. Installing a memory module filler
Preparing the 9080-M9S system for operation after permanently removing a memory
module
Procedure
1. Ensure that you have the electrostatic discharge (ESD) wrist strap on and that the ESD clip is plugged
into a ground jack or connected to an unpainted metal surface. If not, do so now.
2. Replace the service access cover by completing the following steps.
a) Slide the cover (A) onto the system unit as shown in the following figure.
b) Close the release latch (B) by pushing it in the direction shown in the following figure.
212 Power Systems: Removing and replacing parts in the 9080-M9S system

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents