Preparing the 9080-M9S system for operation after installing a memory module

Procedure
1. Ensure that you have the electrostatic discharge (ESD) wrist strap on and that the ESD clip is plugged
into a ground jack or connected to an unpainted metal surface. If not, do so now.
2. Replace the service access cover by completing the following steps.
a) Slide the cover (A) onto the system unit as shown in the following figure.
b) Close the release latch (B) by pushing it in the direction shown in the following figure.
Memory modules 121