Figure 77. Replacing a fan in the system
Preparing the 9080-M9S system control unit for operation after removing and replacing a
fan
To prepare the system for operation after removing and replacing a fan, complete the steps in this
procedure.
Procedure
1. Ensure that you have the electrostatic discharge (ESD) wrist strap on and that the ESD clip is plugged
into a ground jack or connected to an unpainted metal surface. If not, do so now.
2. If you removed the power cords, connect all power cords to the system that you are servicing.
3. If you powered off the system to complete this repair, wait for the service processor comes up to the
Flexible Service Processor (FSP) standby state (the power-on LED on the control panel is flashing
slowly) then continue to the next step to validate all of the cables. If you did not power off the
system, skip the next step and continue to the step to validate only the UPIC cables.
4. Access the ASMI and run the Cable Plugging Validation utility to validate all of the cables.
a) If you are already connected to the ASMI, go to the next step. Otherwise, click All Systems then
select system being serviced. Then, click Actions > View All Actions > Launch Advanced
Systems Management (ASM).
Fans 91