IBM 9080-M9S Manual page 44

Hide thumbs Also See for 9080-M9S:
Table of Contents

Advertisement

Figure 30. Replacing the SMP cable into the system node
5. If the system power is off and you are replacing more than one SMP cable, repeat step "4" on page 37
until all of the SMP cables that you previously identified are reconnected.
6. Route the cable to the cable management bracket and to the sides of the system nodes.
7. If you removed any SMP cable clips from the side of the rack, using your labels, reattach the cable
bundle to the side of the cable management bracket as shown in the following figure.
38 Power Systems: Removing and replacing parts in the 9080-M9S system

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents