Figure 373. Removing the UPIC cable from the system control unit
9. Continue with step "13" on page 435.
10. To prepare the system to install an adapter by using the AIX operating system, complete the
following steps:
a) Log in to the console as root user to access the Hot Plug Manager.
b) At the command line, type smitty.
c) Select Devices > PCI Hot Plug Manager and press Enter.
The PCI Hot-Plug Manager menu displays.
For more information about the menu options in the PCI Hot-Plug Manager screen, see Hot-plug
manager menu (www.ibm.com/support/knowledgecenter/POWER9/p9hak/
p9hak_hotplug_menu.htm).
d) From the PCI Hot-Plug Manager menu, select Add a PCI Hot-Plug Adapter, and then press Enter.
e) Select the appropriate slot from the list that is displayed on the screen, and then press Enter.
f) Physically verify that the slot you identified is where you want to install the adapter.
• Use the blue identify LED on the enclosure to locate the system. Ensure that the serial number
of the system matches the serial number to be serviced.
• Look for a flashing amber LED, which identifies the unoccupied slot that was selected by using
the identify function.
g) Continue with step "13" on page 435.
11. To prepare the system to install an adapter by using the IBM i operating system, complete the
following steps:
a) If necessary, start a System Service Tools (SST) session by typing strsst on the command line of
the Main Menu and then press Enter.