IBM 9080-M9S Manual page 131

Hide thumbs Also See for 9080-M9S:
Table of Contents

Advertisement

Figure 108. Replacing the front screws
4. Review the following information to identify the locations where each SMP cable connects to the
system node that you are servicing. Then, refer to your labels and the following steps to reconnect
the SMP cables that you removed from the system node you are servicing.
• If you have a two node system configuration, use Figure 109 on page 126 and Table 10 on page
126 to determine the point-to-point cabling for SMP cables.
Memory modules 125

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents