TCX1000 Programmable ROADM Hardware Guide
Table 12: Site Preparation Checklist (continued)
Task
Calculate the power consumption and
requirements.
Rack or Cabinet
Verify that your rack or cabinet meets the
minimum requirements for the installation of the
TCX1000-RDM20.
Plan rack or cabinet location, including required
space clearances.
Secure the rack or cabinet to the floor and building
structure.
Cables
Acquire cables and connectors:
Determine the number of cables needed based
on your planned configuration.
Review the maximum distance allowed for each
cable. Choose the length of cable based on the
distance between the hardware components
being connected.
Plan the cable routing and management.
Related
Documentation

TCX1000-RDM20 Rack Requirements

30
For More Information
"TCX1000-RDM20 AC Power
Specifications" on page 51
"TCX1000-RDM20 DC Power
Specifications" on page 53
"TCX1000-RDM20 Rack
Requirements" on page 30
"TCX1000-RDM20 Cabinet
Requirements" on page 31
"TCX1000-RDM20 Clearance
Requirements for Airflow and
Hardware Maintenance" on
page 33
General Electrical Safety Guidelines and Warnings on page 177
General Site Guidelines
Overview of Installing the TCX1000-RDM20 on page 59
Mounting a TCX1000-RDM20 in a Rack or Cabinet on page 62
The TCX1000-RDM20 chassis is designed to be installed in two-post or four-post racks.
Rack requirements consist of:
Rack type
Mounting bracket hole spacing
Performed by
Date