Preparation Overview; Tcx1000-Rdm20 Site Preparation Checklist - Juniper TCX1000-RDM20 Hardware Manual

Programmable roadm
Hide thumbs Also See for TCX1000-RDM20:
Table of Contents

Advertisement

CHAPTER 5

Preparation Overview

TCX1000-RDM20 Site Preparation Checklist

Table 12: Site Preparation Checklist
Task
Environment
Verify that environmental factors such as
temperature and humidity do not exceed the
TCX1000-RDM20 tolerances.
Power
Measure the distance between external power
sources and the TCX1000-RDM20 installation
site.
Copyright © 2019, Juniper Networks, Inc.
TCX1000-RDM20 Site Preparation Checklist on page 29
TCX1000-RDM20 Rack Requirements on page 30
TCX1000-RDM20 Cabinet Requirements on page 31
TCX1000-RDM20 Physical Specifications on page 32
TCX1000-RDM20 Clearance Requirements for Airflow and Hardware
Maintenance on page 33
TCX1000-RDM20 Environmental Requirements and Specifications on page 34
TCX1000-2D8CMD Environmental Requirements and Specifications on page 35
TCX1000-RDM20 Optical Specifications on page 35
TCX1000-2D8CMD Optical Specifications on page 36
TCX1000-RDM20 SFP Kit Optical Specifications on page 37
TCX1000-RDM20 Channel Center Wavelength and Frequency Specifications on page 38
96-Channel Fixed Mux/Demux (FMD96) DWDM 50-GHz Wavelength
Specifications on page 42
TCX1000-RDM20 Chassis Grounding Cable and Lug Specifications on page 47
The checklist in
Table 12 on page 29
preparing a site for a TCX1000-RDM20 installation.
For More Information
"TCX1000-RDM20 Environmental
Requirements and Specifications"
on page 34
summarizes the tasks you need to perform when
Performed by
Date
29

Advertisement

Table of Contents
loading

Table of Contents