Figure 17: Sealing agent (Sikaflex)
Pulling together AHU sections
The AHU sections must be aligned precisely and the front sides shall be exactly parallel to the
other. If necessary, some minor corrections can be made by placing steel plates under the section.
The AHU sections can be pulled together with belts which attach on the base frame, as shown on
Figure 19 and Figure 20.
Figure 19: Pulling AHU sections together
5.1.2

Standard connections and connection components

The connection via base frame must be always made at all AHUs, see Figure 21 and Figure 22.
Figure 21: Hexagon bolt with locknut M8x20 /
M10x30 / M12x40
26/115
Figure 18: Applying the sealing agent
Figure 20: Pulling AHU sections together (detail)
Figure 22: Bolt connection of base frames