ErP conformity according to directive (EU) 1253/2014

The ErP directive (energy related products) determines minimum requirements to the efficiency of
air handling units. Important points, for which the system operator is responsible, are:
Multi staged control
All AHU`s, except those with double application, have to be equipped with multi staged drive or
speed control for fans. See chapter 7 (electrical connection).
Filter change indicator
If one or more filter stages belong to the AHU equipment, then they have to be equipped with an op-
tical display or an acoustic warning in the controlling. They will be triggered if the pressure drop at
the filter exceeds the maximum permissible value. See chapter 9.3 (air filters).
If above mentioned equipment is not included in delivery by TRANE, it has to be provided on site.
2.5

Staff selection and qualification

All persons, who are authorized to work on the air conditioner, must have read and understood the
complete manual - in particular chapter 2 (Safety instructions). Until this task is completed, the
person may not begin to work on the AHU.
All work must be carried out by professionals who have sufficient technical training, experience and
sufficient knowledge of...
Locally applicable safety and occupational health rules
-
-
Locally valid accident prevention regulations
Locally applicable standards and approved rules of practice.
-
All professionals have to recognize and assess the work appropriately and recognize and avoid po-
tential hazards.
Execution of the assembly, installation, electrical connection, commissioning and disposal:
-
by qualified electricians and AHU technicians.
Execution of maintenance / monitoring of the operation:
by technical staff or trained personnel and qualified electricians and AHU technicians.
-
Subsequently, warning triangles indicate warnings that must be adhered to minimize risks to per-
sons who are entrusted with the work on the air conditioner.
3

Reception control / unloading / transportation to installation site

3.1

Reception control

Upon arrival of the equipment, please check immediately the package for completeness and any
-
damage.
Loose supplied parts and assembly materials are in a nylon bag or a box in the AHU.
-
-
If damages are found, immediately complete a damage report and send it to TRANE. Only then
the transport company can make the claim with the insurer (Note damage on the shipping docu-
ments with date and signature in the presence of the carrier). Complaints about apparent dam-
aged or missing parts of the delivery cannot be subsequently recognized, if procedures are not
followed. In case of complaints please inform immediately the TRANE office.