Commissioning

11.1

Overview

Introduction
This section includes information on the following topics:
● Commissioning the ET 200SP distributed I/O system on the PROFINET IO
● Commissioning the ET 200SP distributed I/O system on the PROFIBUS DP
● Startup of the ET 200SP distributed I/O system with empty slots
● Removing/inserting the SIMATIC memory card
● Operating modes of the CPU
● CPU memory reset
● Reassigning parameters during operation
● Identification and maintenance data
Commissioning requirements
Note
Performing tests
You must ensure the safety of your plant. You therefore need to run a complete functional
test and make the necessary safety checks before the final commissioning of a plant.
Also allow for any possible foreseeable errors in the tests. This avoids endangering persons
or equipment during operation.
PRONETA
With SIEMENS PRONETA (PROFINET network analysis), you analyze the system network
during commissioning. PRONETA features two core functions:
● The topology overview independently scans PROFINET and all connected components.
● The IO check is a fast test of the wiring and the module configuration of a system.
You can find SIEMENS PRONETA on the Internet
(http://support.automation.siemens.com/WW/view/en/67460624).