Siemens SIMATIC ET 200SP System Manual page 203

Distributed i/o system
Hide thumbs Also See for SIMATIC ET 200SP:
Table of Contents

Advertisement

Commissioning
11.3 Commissioning the ET 200SP on PROFIBUS DP
Commissioning procedure
For commissioning of the ET 200SP distributed I/O system as an I-slave on the
PROFIBUS DP, we recommend the following procedure:
Table 11- 5
Step
1
2
3
4
5
6
7
8
9
10
11
202
Procedure for commissioning the ET 200SP as an I-slave for PROFIBUS DP
Procedure
Installing ET 200SP (with CPU and CM DP)
Connecting ET 200SP
Supply voltages
PROFIBUS DP
Sensors and actuators
Configuring DP master (including
PROFIBUS address)
Inserting a SIMATIC memory card in the I-
slave (CPU)
Configuring I-slave (including PROFIBUS
address)
Switching on supply voltages for DP master
Switching on supply voltages for I-slaves
Loading configuration in the DP master and
I-slaves
Switching DP master and I-slaves to RUN
Checking LEDs
Testing inputs and outputs
See ...
Section Installation (Page 63)
Section Wiring (Page 86)
Documentation of the DP master
Section Removing/inserting a SIMATIC
memory card on the CPU (Page 205)
CPU 15xxSP-1 PN
(http://support.automation.siemens.com/
WW/view/en/90466439/133300) and CM
DP manual
Documentation of the DP master
CPU 15xxSP-1 PN
(http://support.automation.siemens.com/
WW/view/en/90466439/133300) manual
STEP 7 online help
Documentation of the DP master and
CPU 15xxSP-1 PN
(http://support.automation.siemens.com/
WW/view/en/90466439/133300) manual
CPU 15xxSP-1 PN
(http://support.automation.siemens.com/
WW/view/en/90466439/133300) manual
The following functions are helpful: Mon-
itoring and modifying tags, testing with
program status, forcing, controlling the
outputs. See the Test functions and fault
resolution
(http://support.automation.siemens.com/
WW/view/en/90466439/133300) section
Distributed I/O system
System Manual, 09/2019, A5E03576849-AJ

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents