Attaching The Take-Up Leader - Bernina Q 24 Manual

Frame mounting
Hide thumbs Also See for Q 24:
Table of Contents

Advertisement

Quilting frame assembly
> Determine the center of the backing rail using the tape measure and mark this position with a pencil.
> Measure and then use a pencil to mark out a point 155 cm (61 inches) to the left and the right of the
> Attach double-sided adhesive tape (M18) from the left-hand marking all the way to the right-hand
> Remove the protective film on the top of the adhesive tape.
> Unfold the back leader so that the material is suspended between the rail and the quilting frame and the
> Position the center line of the back leader (dark broken line) on the marked center of the backing rail.
> Attach the leader to the adhesive tape, working from the center outward to the left and right. Make sure
> Press the leader firmly onto the adhesive tape and roll it up.
> Trim any excess adhesive tape.

Attaching the Take-up leader

Required parts and tools:
• Take-up leader
• Double-sided adhesive tape (M18)
• Pencil (not included in the scope of delivery)
• Tape measure, quilting guide or ruler (not included in the scope of delivery)
56
marked center.
marking. Be sure to attach the tape straight without any kinks.
printed side is pointing backward toward the quilting frame.
you guide the edge of the material precisely along the edge of the adhesive tape.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Q 20

Table of Contents