Attaching The Side Clamps - Bernina Q 24 Manual

Frame mounting
Hide thumbs Also See for Q 24:
Table of Contents

Advertisement

Quilting frame assembly
> Transfer the center position of the unrolled back leader onto the top rail.
> To make it easier to fit the top leader, swing the top rail upward.
> Measure and then use a pencil to mark out a point 155 cm (61 inches) to the left and the right of the
> Attach double-sided adhesive tape (M18) from the left-hand marking all the way to the right-hand
> Unfold the top leader so that the material is suspended between you and the rail and the printed side is
> Position the center line of the top leader (dark broken line) on the marked center of the top rail.
> Attach the leader to the adhesive tape, working from the center outward to the left and right. Make sure
> Press the leader firmly onto the adhesive tape and roll it up.
> Check to ensure that the center of the top leader and the back leader line up precisely. If necessary,
> Trim any excess adhesive tape.
> Swing the top rail back down again.

Attaching the side clamps

Required parts and tools:
• 4x bungee cords (M16)
• 4x safety clips (M17)
> Guide the bungee cord (M16) through the bracket on the left-hand rail support from inside to outside.
> Attach the safety clip (M17) to the end of the bungee cord (M16).
58
marked center.
marking. Be sure to attach the tape straight without any kinks.
pointing toward you.
you guide the edge of the material precisely along the edge of the adhesive tape.
reposition the top leader.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Q 20

Table of Contents