Installing The Server Cover - Avaya Aura S8800 Maintaining

Server for sip enablement services
Hide thumbs Also See for Aura S8800:
Table of Contents

Advertisement

Replace FRUs
5. Lift the server cover off the server and set it aside.

Installing the server cover

About this task
Important:
Always use an electrostatic-discharge wrist strap or other grounding system when you work
inside the server. See
Procedure
1. Make sure that all internal cables, PCIe cards, and other components are installed
2. Position the cover on top of the server. See the following figure.
16
Maintaining the Avaya S8800 Server for Avaya Aura
1
2
Important:
For proper cooling and airflow, replace the cover before you turn on the server.
Operating the server for extended periods of time (over 30 minutes) with the cover
removed might damage server components.
Protecting against ESD damage
and seated correctly and that you have not left loose tools or parts inside the server.
Also, make sure that all internal cables are correctly routed.
Comments? infodev@avaya.com
Cover
Tab
for more information.
®
SIP Enablement Services
November 2009

Advertisement

Table of Contents
loading

Table of Contents