Carrying Out A Test Run - DURKOPP ADLER 581 Operating Instructions Manual

Table of Contents

Advertisement

154

7.16 Carrying out a test run

Once the setup work is complete, put the machine into operation
and perform a test run. Follow the order given below:
Order
1.
Switch on the machine.
2.
Carry out a test run.
3.
Switch off the machine.
To perform a test run:
1.
Insert the sewing material.
2.
Select a buttonhole shape ( p. 51) and first set a low speed.
3.
Sew the buttonhole ( p. 42).
4.
Continuously increase the speed.
5.
Check whether the buttonhole meets the desired requirements.
If the requirements are not met, change the thread tension
( p. 34).
Information
If the welcome screen does not appear on the control panel after
switching on even after waiting for a long time, this means that
there is no software on the control.
In this case, the software must first be installed ( Service
Instructions).
Operating Instructions 581 - 01.0 - 05/2016
Setup

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents