Carrying Out A Test Run - DURKOPP ADLER 610-10 Operating Instructions Manual

Hide thumbs Also See for 610-10:
Table of Contents

Advertisement

108
7.9

Carrying out a test run

When setup is complete, perform a test run to check the function-
ality of the machine.
To perform a test run:
1. Insert the power plug.
2. Thread needle thread ( p. 23).
3. Thread looper thread ( p. 25).
4. Switch on the machine.
5. Position the sewing material.
6. Start the sewing process at low speed and then continuously
increase the speed.
7. Check that the seams conform to the desired requirements.
If they are not, set the thread tension ( p. 31).
Operating Instructions 610-10/630-10 - 01.0 - 01/2021
Setup

Advertisement

Table of Contents
loading

This manual is also suitable for:

630-10

Table of Contents