7 DATA LINK PROCEDURE

7.9 Checking Parameters (Parameter Confirmation Test)

Set the master module's "mode setting
switch" to "5".
The test can be performed even when cables are
connected to the master module.
For AJ61BT11:
Operate the RUN/STOP key switch and the
RESET key switch of ACPU in the following
procedure:
Reset the module using the
RESET key swich.
Yn6 or Yn8 are turned ON
The LEDs are lit in the following manner until the
mode setting switch is changed.
SW
M/S
PRM
TIME
Continued to the next page
Contents of the parameters registered in the master module's E
confirmed.
Perform the test by following the procedure below:
Start
ACPU
AJ61
BT11
Set the RUN/STOP key
switch to "RUN".
Repeats
For A1SJ61BT11:
AnSCPU
A2ASCPU
Operate the RUN/STOP key switch of the
AnS/A2ASCPU in the following procedure:
7 - 20
MELSEC-A
2
PROM can be
A1S
J61
BT11
STOP
RESET
RUN