Commissioning
5.6 Commissioning with STARTER
Figure 5-17
The summary information can be copied to the clipboard for pasting into another application,
such as, Notepad as a permanent record of the configuration.
Click "Finish".
To complete the basic commissioning of the Inverter, the following tasks must be completed:
● Ensure that the Inverter and motor are powered-up (no run command should be issued).
● Ensure that the Inverter is correctly connected to the PC, using the appropriate
In the project tree under commissioning, select "Control panel". The control panel will appear
at the bottom of the screen.
Figure 5-18
Press the Start [I] button and the motor calculation will be performed. When this has been
completed, the basic commissioning of the Inverter and motor has been completed.
64
Configuration summary
communications cable.
Control panel activation
Operating Instructions, 2009-05-15, A5E02385577A AB
SINAMICS G110D

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents