Operation Verification Checklist - Precor Experience Series 800 line EFX Service Manual

Table of Contents

Advertisement

operating the unit, you will verify basic resistance and incline control functionality and
that the various console metric indicators and user interface displays are showing the
correct values and user information:
a. Operate the RESISTANCE control from level 1 through 20. Concentrate on the
feel of the pedaling motion verifying increased resistance. Be on the alert for any
unusual noises, odors, or vibrations.
b. Press and hold the INCLINE UP control to raise the crossramp from level 1 until
the maximum incline level is reached while viewing the incline indicator. Confirm
that the indicators maximum crossramp level reads 20 and that there are no
unusual noises or vibration.
c. Press and hold the INCLINE DOWN control to lower the crossramp from level
20 until the lowest level is reached while viewing the incline indicator. Confirm
that the ramp returns to level 1 (lowest level) and that there are no unusual noises
or vibrations.
3. Final Error Code Check:
Verify that there were no new relevant logged error codes caused the operation veri-
fication tests.
a. Go to the Error Log (or Event Log) and make sure that there are no new relevant
logged error codes. If there are any new relevant error codes, resolve the error
code and repeat the operation verification procedure.
b. On P10, P30 consoles, clear the Error Log of all logged error codes.
4. Return to service:
On successful completion of these tests, return unit to service.

Operation Verification Checklist

Use this checklist to track that each
successfully completed. When each test was successfully completed, return the unit to ser-
vice.
Error Log Verification Check, record, and then clear any errors in the error log.
Display Test: Verify the console metric display LEDs function properly.
Keypad Test: Verify console hardkeys and keypad keys function properly.
Heart Rate Test: Verify the heart rate functions properly.
CrossRamp Test; Verify the cross ramp operates through the full incline range.
Operational Check: Verify the unit performance while operating the unit in
Manual program mode.
Error Log Check: Final check for any new error codes that may have been
logged during the verification tests.
.
Experience Series 800 Line EFX
"Operation Verification Tests" on the previous page
2 Operation Verification
Operation Verification Checklist
was
12

Advertisement

Table of Contents
loading

This manual is also suitable for:

Efx800-16 base

Table of Contents