Mitsubishi L02CPU User Manual page 174

Melsec-l series
Hide thumbs Also See for L02CPU:
Table of Contents

Advertisement

If the backup start contact is turned on while the value in SD690 is 0
prepared), data are not backed up. If the backup start contact is on before the value in SD690 becomes 2
(Backup start preparation completed), turning off and then on the backup start contact again while the value in
SD690 is 2
ON
Backup start
setup contact
OFF
SM691
ON
(Backup start
preparation
OFF
status flag)
ON
Backup start
contact
OFF
SD690
(Backup status)
172
(Backup start preparation completed) starts backup.
H
Backup start setup is requested
from a programming tool or the backup
startsetup contact is turned on.
Before backup start
Backup start prepared
0
Backup start is requested
from a programming tool or the backup
start contact is turned on.
Backup start
preparation completed
1
2
(Before backup start) or 1
H
Backup in execution
Backup completed
3
4
(Backup start
H
H

Advertisement

Table of Contents
loading

This manual is also suitable for:

L26cpu-bt

Table of Contents