Prerequisites For Installing The Router; Selecting The Router Installation Location; Ventilation And Heat Sources; Router Operating Position - Hughes HN9400 Installation Manual

Satellite router
Hide thumbs Also See for HN9400:
Table of Contents

Advertisement

Chapter 3

Prerequisites for installing the router

Selecting the router installation location

Ventilation and heat sources

Router operating position

HN9400 Satellite Router Installation Guide
16
1038554-0001 Revision B
The following are required before you can install, commission, and register the satellite router:
• The antenna and radio assembly must be installed, as instructed in the antenna installation
guide. (However, you point the antenna as part of the router commissioning process, which
is explained later in this installation guide.)
• The IFL cables must be installed and connected to the satellite router and to the radio
assembly (LNB and transmitter).
See also
Items required for installation
Select a location for the satellite router that will accommodate all required cable connections,
including connection to the power source.
Make sure the installation location meets the following requirements concerning ventilation and
heat sources.
• Do not block any of the router's ventilation openings.
• Leave 6 inches of space around the top and sides of the router to ensure adequate ventilation
and prevent overheating.
• Do not place the router near a heat source such as direct sunlight, a radiator, heat register
or vent, oven, stove, amplifier, or other apparatus that produces heat.
position as shown in

Figure 4: HN9400 in vertical position

could result in insufficient ventilation, overheating, and malfunction.
on page 8 and
Related components
Install and operate the HN9400 router only in the upright vertical
Installing the satellite router
on page 11.
on page 17. Any other position

Advertisement

Table of Contents
loading

Table of Contents