Chapter 3: Installing The Satellite Router - Hughes HN9400 Installation Manual

Satellite router
Hide thumbs Also See for HN9400:
Table of Contents

Advertisement

Chapter
3
Installing the satellite router
Topics:
Prerequisites for installing the
router
Selecting the router installation
location
Router operating position
Connecting the transmit and
receive cables
Connecting the installer laptop to
the router
Connecting the power supply
Powering up the router
LEDS on power-up
Installation of the HN9400 satellite router consists of physical installation,
followed by commissioning and registration. These processes prepare the router
for operation on the satellite network. Installation tasks include:
• Physical installation and power-up
• Entering parameters required for commissioning
• Commissioning, including antenna pointing
The installation software is factory pre-installed in the satellite router. If
necessary, this software is automatically updated as part of the installation
process. You access the installation software through a browser on your installer
computer to perform tasks such as entering required parameters.
HN9400 Satellite Router Installation Guide
1038554-0001 Revision B
15

Advertisement

Table of Contents
loading

Table of Contents