Power supply installation
Procedures involving electrical connections must be performed only by qualified personnel.
Ensure that you obey all displayed warning notices on power equipment and connections.

Installing the second power supply module (AC or DC)

Introduction

One power supply module is shipped installed. The second power supply module must be
installed on-site.

AC versus DC systems

The power supply modules are similar in appearance for both AC and DC 1002rp servers. The
procedures in this section apply to both AC and DC 1002rp servers.

About the power supply module

After the server is powered up (later in this guide), the power supply module LED indicates its
status.
A green LED on the power supply module indicates that the module is working properly. If the
LED is unlit or red, the module is failing or has failed. A problem with the power supply module is
also indicated if an alarm sounds or the power supply LED on the front of the server turns red.
The diagram below shows the location of the power supply modules in a server that has two
power supply modules installed:
®