Chapter 3: Preparing For Installation; In This Chapter; Installation Overview; Introduction - Avaya callpilot 1002rp Hardware Installation

Hide thumbs Also See for callpilot 1002rp:
Table of Contents

Advertisement

Chapter 3: Preparing for installation

In this chapter

Installation overview

Unpacking the 1002rp server
Removing the front bezel and server cover
Inspecting the server interior
Installation overview

Introduction

This section provides an overview of the steps required to install the 1002rp server and
peripheral devices.

Installation checklist

The following checklist identifies the tasks that must be performed when installing the Avaya
®
CallPilot
server. For detailed instructions, see
are finished with the installation, continue with the Installation and Configuration Task List
(NN44200-306).
Step
1
Ensure that you have reviewed the "Installing the Avaya CallPilot server"
section in the Installation and Configuration Task List (NN44200-306),
and completed stage 1 of the "Installation checklist."
®
Avaya CallPilot
1002rp Server Hardware Installation
on page 25
on page 28
on page 31
Description
on page 29
Installing the server
on page 43 When you
Check
December 2010
25

Advertisement

Table of Contents
loading

Table of Contents