Aligning The Boiler Block For Pre-Assembled Deliveries - Buderus Logano GE315 Installation And Maintenance Instructions Manual

Cast iron sectional boiler for oil or gaspressure jet burners
Table of Contents

Advertisement

2.4.3 Aligning the boiler block for pre-assembled
deliveries
Cut through the securing band (
Remove the pallet prior to positioning the boiler
(
Fig. 18, [2]).
DANGER TO LIFE!
Hazard from falling material!
Hazard through falling from unsuitable
CAUTION
means of transportation!
Observe Health and Safety at Work
Regulations regarding lifting with lifting
gear!
(For weight details of various boiler sizes
see section "Dimensions and
specification", page 35).
Align the boiler on the plinth or antivibration
absorbing plinth in the horizontal and vertical plane
(
Chapter 2.3 "Positioning", page 9). To do this use
the boiler section base wedges supplied.
The return header and sensor well installation
described on the following pages applies to boilers
delivered as pre-assembled in sections.
Logano GE315 - We reserve the right to make any changes due to technical modifications
Fig. 18, [1]).
2
Fig. 18 Boiler block on pallet
Installation
2
1
17

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents