Recommissioning the heating system

7.20 Commissioning log

V Initial and date the commissioning operations carried
out.
Commissioning operations
1. Fill heating system and check for leaks
Heating system pressure
2. Details in "Water quality requirements for Logano plus
GB312" manual taken into account
Concentration of any additives
3. Record gas characteristics: calorific value
4. Check gas pipe for leaks
Purging the gas pipe
5. Bringing the system up to operating pressure
6. Check air inlet/outlet vents and flue pipe connection
7. Check air inlet diaphragm
8. Check appliance equipment
9. Starting up the control and the burner
10. Adjust burner setting if necessary
11. Record readings taken
Flue pressure
Flue gas temperature
Air temperature
Carbon dioxide content (CO
Carbon monoxide content (CO), without air
12. Measuring the gas supply dynamic pressure
13. Checking for leaks during operation
14. Function checks
Check ionization current
15. Fitting outer casing components
16. Informing the end user and handing over technical docu-
mentation
17. Correct commissioning confirmed by installer
18. Signature of operator
Tab. 14 Commissioning log
54
) or oxygen content (O
)
2
2
Logano plus GB312 - Technical specifications are subject to change without prior notice
Page
Readings taken
____________ psi
Add.: ______ Conc.:___%
42
_________ BTU/ft³
42
51
41
43
43
42
44
45
48
max. load
min. load
___in W.C. ___in W.C.
______ °F
______ °F
______ °F
______ °F
______ %
______ %
_____ ppm
_____ ppm
53
___________ in W.C.
53
52
____________ μA
54
54
Signature:_______________________
Signature:_______________________
Comments

Advertisement