Commissioning log

▶ Initial and date the commissioning steps carried out.
Commissioning operations
1.
Fill heating system and check for leaks
• Heating system pressure
2.
Bringing the system up to operating pressure
▶ bleeding heating system
▶ Testing relief valve
▶ adjust the expansion tank pressure ( see the expansion tank manufacturer's
documentation)
3.
Checking combustion air supply and flue system
4.
Checking position of heat exchanger baffles
5.
Switching on the controls and burner ( controls' documentation)
6.
Checking flue gas temperature and raising if required
7.
Checking the manual reset high limit (STB)
8.
Adjusting the controls settings to suit the customer's requirements ( controls'
documentation)
9.
Informing the end user and handing over technical documentation
Confirmation of properly completed commissioning
Inform the customer about the correct fuel and correct
operating pressure. Enter the details in the table
( boiler operating instructions).
Logano G115 WS US/CA – 6 720 813 418 (2019/09)
Commissioning the heating system
Page
Readings taken
21
____________ psi
28
____________ psi
29
29
30
____________ °F
32
Company stamp/signature/date