6.10 Commissioning log

V Initial and date the commissioning steps carried out.
Commissioning operations
1.
Fill heating system and check for leaks
– Heating system pressure
2.
Bringing the system up to operating pressure
V bleeding heating system
V Testing relief valve
V adjust the expansion tank pressure (
manufacturer's documentation)
3.
Checking combustion air supply and flue system
4.
Checking position of heat exchanger baffles
5.
Switching on the controls and burner (
tion)
6.
Checking flue gas temperature and raising if required
7.
Checking the manual reset high limit (STB)
8.
Adjusting the controls settings to suit the customer's require-
ments (
controls' documentation)
9.
Informing the end user and handing over technical documentation
Confirmation of properly completed commissioning
Inform the customer about the correct fuel
and correct operating pressure. Enter the de-
tails in the table (
tions).
Logano G115 WS US/CA - Technical specifications are subject to change without prior notice.
see the expansion tank
controls' documenta-
boiler operating instruc-
Commissioning the heating system
Page
Readings taken
21
____________ psi
28
____________ psi
29
29
30
____________ °F
32
Company stamp/signature/date
6
Comments
33