Table Of Contents - Buderus Logano plus GB312 Installation Manual

Table of Contents

Advertisement

Contents
Contents
1
General safety instructions and explanation of
1.1
Safety instructions
1.2
2
2.1
Intended use
2.2
Standards, regulations and directives
2.2.1 National regulations
2.3
Compliance with standards and regulations
2.4
2.4.1 Other important information
2.5
Heating system water quality
2.6
Tools, materials and equipment
2.7
Disposal
2.8
2.9
2.10
2.10.1 Logano plus GB312 dimensions
3
3.1
Lifting and carrying the boiler
3.2
4
4.1
Boiler room requirements
4.2
4.3
5
Openings for combustion air supply
and venting
6
6.1
6.2
Installing the flue system
6.3
6.4
Installation of the roof penetration of a vertical flue
systems
6.5
Connecting the air supply (for direct vent operations)26
6.6
Installing the wall exit for the air pipe
6.7
6.8
6.9
6.9.1 General safety instructions
6.9.3 Installing B-Kit
2
6.9.5 Fitting the heating system return
6.9.6 Installing the DHW Tank
4
4
6.10
5
6.11
6.11.1 Installing gas feed
6
6.12
6
6.12.1 Connecting the main power supply
6
6.12.2 Leveling the boiler
6
6
7
7
8
7.1
8
7.2
8
7.3
8
7.4
8
9
7.5
11
7.6
12
7.7
12
7.8
13
7.9
15
7.9.1 Boiler intended to be used with Logamatic 4000
15
17
7.9.3 Continuing commissioning procedure with RC35
7.10
18
18
7.10.2 Opening the Service menu and viewing monitor
19
19
7.11
7.11.1 CO2 content, natural gas type A
7.12
20
7.12.1 CO2 content, natural gas type A (minimum output) 49
22
7.12.2 Reading off and comparing CO2 levels
24
7.13
24
25
7.14
26
7.14.2 Returning to operating mode from the flue gas test
27
7.14.3 Flue pressure
27
7.14.4 Carbon monoxide content
7.15
29
7.15.1 Checking the (flame) ionization current
29
7.16
30
7.17
30
7.18
32
Logano plus GB312 - Technical specifications are subject to change without prior notice
Checking appliance equipment
Checking the air supply/ventilation and flue pipe
connection
Checking the air inlet diaphragm
Making the heating system ready for operation
Commissioning the control unit and burner without
programming unit RC35
Commissioning the control unit and burner with
programming unit RC35
Switching on the boiler on the BC10
data on the RC35
Adjusting and checking CO2 level
Adjusting and checking CO2 level
at minimum output
Checking and monitoring CO2 level
Recording measured values
to show the boiler temperature
Checking for leaks during operation
Fitting outer casing components
32
32
33
34
36
36
37
38
38
40
41
42
43
43
44
44
45
45
45
45
45
46
46
46
47
47
48
48
48
49
49
49
50
50
50
50
51
51
52
52
53

Advertisement

Table of Contents
loading

Table of Contents