Transporting The Boiler - Buderus Logano plus GB312 Installation Manual

Table of Contents

Advertisement

3

Transporting the boiler

This section describes how to move the boiler safely and
without damaging it.
Caution: Risk of system damage due to im-
pacts.
The boiler as delivered contains components
that are sensitive to shocks.
V If the boiler has to be moved after delivery,
protect all components against shocks
and impacts.
V Observe the transport instructions on the
packaging.
If the boiler is not to be installed immediately,
protect the connections from entry of dirt.
Dispose of packaging in an environmentally
responsible manner.
3.1
Lifting and carrying the boiler
The boiler can be carried to its installation site using 2
pipes (1¼", approx. 80 inches long).
V Unscrew the locking screw from the top centre of the
boiler front panel.
V Lift font panel slightly and draw forwards to remove.
V Unscrew the locking screws from the side panels at the
front and back of the boiler.
V Slightly lift the side panels and remove.
Logano plus GB312 - Technical specifications are subject to change without prior notice
Transporting the boiler
Fig. 5
Removing front and side panels
1
Front panel
2
Side panel
3
Locking screw
3
15

Advertisement

Table of Contents
loading

Table of Contents