8

Shutting down the heating system

Caution: Risk of system damage due to
freezing.
If the heating system has been switched off,
it may freeze up at sub-zero temperatures.
V Protect the heating system from freezing
when there is a danger of frost. To do so,
drain the water out of the heating system
from its lowest point. When doing so, the
vent at the highest point of the system
must be open.
8.1

Shutting down the heating system using the programmer

Turn off the heating system on the Logamatic BC10 basic
control unit. When the Logamatic BC10 basic control unit
is switched off, the burner is automatically shut down at
the same time. For more detailed information about using
the Logamatic BC10 basic control unit, refer to Section 7,
page 41.
V Switch off the heating system with the BC10 ON/OFF
switch.
V Turn off the main isolating valve.
8.2

Shutting down the heating system in an emergency

The circuit-breaker for the boiler room or the
heating emergency stop switch should only
be used to switch off the heating system in an
emergency.
8.2.1

Action in an emergency

Explain to the customer what to do in an emergency, e.g.
a fire.
V Never put yourself at risk of fatal injury. Your own safety
must always take the highest priority.
V Turn off the main isolating valve.
V Disconnect the heating system from the electrical
power supply by means of the emergency stop switch
or the appropriate circuit-breaker.
Logano plus GB312 - Technical specifications are subject to change without prior notice
Shutting down the heating system
110
100
120
90
130
Eco
140
Aut
Fig. 50 Logamatic BC10 basic control unit
8
130
110
150
90
170
190
Aut
7 747 010 720-38.2RS