11.5 Commissioning log

The Logano G615 can be used with an oil- or gas-fired
burner. Fill in the commissioning log for the appropriate
type of oil or gas burner carefully.
Commissioning operations
1.
Perform leak test of the entire system
2.
Fill the heating system with water
3.
Air purge the heating system
4.
Perform the leak test if the boiler was assembled on site
5.
Record the filling water quantity and composition in the
operator's log (included with the technical
documentation).
6.
Check position of the flue gas baffles (do not install
baffles in the 16-section boiler))
7.
Check the fuel line for leaks.
8.
Start up the control panel
9.
Initial burner start-up
10.
Check the flue gas temperature
11.
Check vent pipe for leaks
12.
Check boiler and flue gas side for leaks
13.
Enter the fuel used in the table provided in the operating
instructions.
14.
Inform the owner and operator and hand over technical
documentation
15.
Confirm properly-completed commissioning
Company stamp/signature/date
Logano G615 - Subject to technical modifications
B Sign all start-up work as completed and enter the
relevant date.
Individual steps
Comments (signature)
page 43
page 26
page 29
page 44
See burner
documentation
11
System start-up