Rudder Linkage Installation - Hangar 9 Funtana 125 Assembly Manual

Arf plane
Table of Contents

Advertisement

Step 7
Slide the spinner backplate on the engine shaft. It may be
necessary to use a space to take up the space between the
backplate and engine shaft. This will be included with the
spinner adapter.
Step 8
Slide the propeller on the engine shaft. Make sure to balance
the propeller before installation to reduce vibrations that
could damage the engine or airframe.
44
Step 9
Secure the propeller and spinner backplate using the adapter
kit that matches your spinner selection. Always use an open
end or box wrench to tighten the propeller adapter. Using an
adjustable wrench will eventually damage the nut.
Step 10
Secure the spinner cone to complete the cowling installation.

Rudder Linkage Installation

Required Parts
Fuselage assembly
Ball end
Clevis end
4-40 locknut
2mm x 12mm machine screw 2mm washer
2mm locknut
1
/
1
2
4-40 x 1/2-inch hex head bolt
Threaded pushrod, 5-inch (127mm)
Tools and Adhesives
Phillips screwdriver: #1
Ruler
Hex wrench: 3/32-inch or 2.5mm
Nut driver: 4mm, 1/4-inch or 5.5mm
Step 1
Locate the items necessary to install the rudder linkage
included with your model.
Hangar 9 Funtana 125 ARF Assembly Manual
-inch servo arm

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents