Electric Motor Installation - Hangar 9 Funtana 125 Assembly Manual

Arf plane
Table of Contents

Advertisement


Step 18
Attach the wheel pant using a 3mm x 12mm hex head bolt,
3mm washer and a 2.5mm hex wrench. Make sure to use
threadlock on the bolt so it won't vibrate loose in flight.
Step 19
Repeat Steps 14 through 18 to attach the remaining wheel
pant to the landing gear.
24

Electric Motor Installation

Required Parts
Fuselage assembly
Plywood motor box
Motor with hardware
Electronic speed control
4mm washer (8)
Plywood battery tray
Hook and loop strap (5)
Tie wrap (3)
Motor battery (2)
4mm x 15mm hex head bolts (8)
24-inch (610mm) servo extension
Tools and Adhesives
Hex wrench: 2.5mm, 3mm
Soldering iron
Solder
Ruler
30-minute epoxy
Mixing cup
Mixing stick
Paper towel
Rubbing alcohol
Clear tape
Threadlock
Step 1
Locate the items necessary to install the electric motor
included with your model.
Step 2
Use a 2.5mm hex wrench to attach the propeller adapter to
the front of the motor. Make sure to use threadlock on the
screws so they don't vibrate loose.
Step 3
Use a 2.5mm hex wrench to attach the X-mount to the rear
of the motor. Again, use threadlock on the screws.
Hangar 9 Funtana 125 ARF Assembly Manual

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents