3).Take out the nuts and screwdriver from the
tool box to fix the platform and platform holder
firmly.
Note: After installing the platform installation,
please tighten the four black screws a little bit
more under the build plate to lower it to avoid
knocking the extruders in next operation.
4).Connect the power wire and data cable of
platform with the connectors.
Caution: Make sure the plugs are fully connected.
Otherwise the platform may not heat or may over
heat.
Need help?
Do you have a question about the CreatBot DS and is the answer not in the manual?