Installing the UPS

NOTE
to your equipment and void your warranty.
NOTE
completed.
To install the UPS:

1. Remove the front cover of each UPS

Hold the cover part without LCD on the right side and extract it(see Fig.7)
C A U T I
Connect the internal battery connector (see Figure 8)
2.
Connect red to red, Press the connector tightly together to ensure a proper connection.
A small amount of arcing may occur when connecting the internal batteries. This is normal
and will not harm personnel. Connect the cables quickly and firmly
Do not make unauthorized changes to the ups; otherwise, damage may occur
Do not connect the ups power cord to utility until after installation is
Figure7 Extract UPS front cover